Sunshine Gateway Solar Energy Center

Columbia County, Florida · EIA plant ID 61763 · Operator: Florida Power & Light Co
SolarBatteriesSolar PhotovoltaicBA: FPL
Nameplate105MWSummer 105 MW
Generators2in service
Net generation131GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20192020202120222023202420252026202720.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2019145.722.3%—
2020152.323.3%—
2021143.822.0%—
2022147.923.1%—
2023137.821.5%—
2024130.320.3%—
2025134.921.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV74.574.5Jan 2019Operating—coming soon
2BatteriesBA3030Dec 2021Operating—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Power & Light Co100.0%105 MW

Nearby plants

Within 80 km.
Echo River Solar105 MW11 km
Swift Creek Chemical Complex19 MW21.1 km
Price Creek75 MW23.4 km
Twin Rivers Solar Power Plant75 MW28.7 km
Hildreth Solar Power Plant75 MW36.8 km
Suwannee Solar Facility9 MW41.8 km