Twin Rivers Solar Power Plant

Hamilton County, Florida · EIA plant ID 63518 · Operator: Duke Energy Florida, Inc
SolarSolar PhotovoltaicBA: FPC
Nameplate75MWSummer 75 MW
Generators1in service
Net generation160GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202120222023202420252026202724.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20218515.4%—
2022166.225.3%—
2023147.222.4%—
2024156.623.8%—
202516625.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV74.974.9Mar 2021Operating—coming soon

Owner / operator

Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Florida, Inc100.0%75 MW

Nearby plants

Within 80 km.
Swift Creek Chemical Complex19 MW10.1 km
Jennings Energy Storage Facility6 MW19.7 km
Hamilton Solar Power Plant75 MW21.1 km
Echo River Solar105 MW21.4 km
Suwannee Solar Facility9 MW22.1 km
Suwannee River198 MW22.6 km