Foxtail Wind, LLC
Dickey County, North Dakota · EIA plant ID 61747 · Operator: Foxtail Wind, LLC
Nameplate150MWSummer 150 MW
Generators1in service
Net generation612GWh12 mo to Aug 2026
Capacity factor47%wind units, summer MW
Heat rate—thermal plants only
First online2020
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 614.5 | 46.6% | — |
| 2021 | 621 | 47.3% | — |
| 2022 | 556.7 | 42.4% | — |
| 2023 | 578.8 | 44.0% | — |
| 2024 | 586.9 | 44.5% | — |
| 2025 | 623 | 47.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 150 | 150 | Jan 2020 | Operating | — | vestas V120-2.0 |
Owner / operator
Operator: Foxtail Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Northern States Power Co - Minnesota | 100.0% | 150 MW |
Nearby plants
Within 80 km.
| Merricourt Wind Energy Center | 150 MW | 13.8 km |
| Tatanka Wind Power LLC | 180 MW | 16.3 km |
| FPL Energy North Dakota Wind I/II | 62 MW | 25.5 km |
| Badger Wind, LLC | 250 MW | 56.9 km |