Walton County, Georgia · EIA plant ID 61740 · Operator: Walton Solar
SolarSolar PhotovoltaicBA: SOCO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202620.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20185.621.2%—
20195.821.9%—
20205.119.5%—
20215.521.1%—
20226.524.7%—
20235.320.2%—
20245.520.8%—
20255.420.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GR01Solar PhotovoltaicPV33Jan 2018Operating—coming soon

Owner / operator

Operator: Walton Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Walton Solar100.0%3 MW

Nearby plants

Within 80 km.
Doyle Energy Facility409 MW0.8 km
Walton County Power LLC494 MW3.3 km
MPC Generating386 MW3.6 km
Mount Vernon Solar1 MW5.5 km
Pleasant Valley Solar3 MW12 km
Georgia LFG Oak Grove Plant7 MW14.8 km