Georgia LFG Oak Grove Plant
Barrow County, Georgia · EIA plant ID 61385 · Operator: Cube District Energy, LLC
Nameplate7MWSummer 6 MW
Generators3in service
Net generation34GWh12 mo to Dec 2025
Capacity factor48%other units, summer MW
Heat rate12,490Btu/kWhfossil units, electric fuel, HHV
First online2016
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 12.1 | 52.4% | — |
| 2017 | 31.4 | 56.9% | — |
| 2018 | 30.6 | 52.9% | 8,738 |
| 2019 | 38.4 | 54.7% | 8,898 |
| 2020 | 39.8 | 63.0% | 9,938 |
| 2021 | 47.7 | 81.3% | 10,452 |
| 2022 | 36.3 | 57.8% | 11,275 |
| 2023 | 38.4 | 57.4% | 10,474 |
| 2024 | 38.7 | 54.4% | 11,459 |
| 2025 | 34.3 | 48.2% | 12,490 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GM01 | Landfill Gas | IC | 2.2 | 2.1 | Aug 2016 | Operating | — | coming soon |
| GM02 | Landfill Gas | IC | 2.2 | 2.1 | Aug 2016 | Operating | — | coming soon |
| GM03 | Landfill Gas | IC | 2.2 | 2.1 | Aug 2016 | Operating | — | coming soon |
Owner / operator
Operator: Cube District Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cube District Energy, LLC | 100.0% | 7 MW |
Nearby plants
Within 80 km.
| Cedar Creek Solar, LLC | 2 MW | 7 km |
| Gratis Road Solar Facility | 3 MW | 14.8 km |
| Doyle Energy Facility | 409 MW | 15.4 km |
| Walton County Power LLC | 494 MW | 17.9 km |
| MPC Generating | 386 MW | 18.2 km |
| Mount Vernon Solar | 1 MW | 18.3 km |