GWCC PV Solar Farm

Prince Georges County, Maryland · EIA plant ID 61738 · Operator: GWCC PV Solar Farm
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202617.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20171.913.3%—
2018214.1%—
2019214.3%—
20202.719.2%—
20212.820.1%—
20222.316.6%—
20232.417.5%—
20242.115.1%—
20252.417.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SOLARSolar PhotovoltaicPV1.61.6Jan 2015Operating—coming soon

Owner / operator

Operator: GWCC PV Solar Farm. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
GWCC PV Solar Farm100.0%2 MW

Nearby plants

Within 80 km.
IKEA College Park 4112 MW1.5 km
UMCP CHP Plantretired4.2 km
UE-00301MD, LLC1 MW5.5 km
Central Utility Plant at White Oak54 MW6.8 km
Spectrum Solar Hybrid6 MW8.3 km
IGS CC, LLC2 MW10.4 km