UMCP CHP PlantRetired

Prince Georges County, Maryland · EIA plant ID 56038 · Operator: Trigen-Cinergy Solutions College Park
Natural gasPJMBA: PJM

×27 MW natural gas retired since 2020 (latest Mar 2025)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20032005200720092011201320152017201920222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%20052010201520202025

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0006,5007,0007,5002004200620082010201220142016
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200300.0%—
2004131.371.9%7,537
2005166.991.6%7,537
2006159.587.5%6,332
2007164.490.2%6,559
2008168.792.3%6,534
2009167.692.0%6,614
2010151.383.0%6,865
2011152.983.9%6,846
2012153.183.8%7,143
2013159.187.3%6,343
2014150.782.7%6,749
2015154.784.9%6,417
2016155.785.2%—
201793.651.4%—
201884.846.5%—
201969.938.4%—
202080.344.0%—
202295.452.4%—
202375.541.4%—
202484.446.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT119.4Jun 2003Retired Mar 2025—coming soon
2Natural Gas Fired Combustion TurbineGT119.4Jun 2003Retired Mar 2025—coming soon
3Natural Gas Steam TurbineST5.42Jul 2003Retired Mar 2025—coming soon

Owner / operator

Operator: Trigen-Cinergy Solutions College Park. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
IKEA College Park 4112 MW4 km
GWCC PV Solar Farm2 MW4.2 km
Spectrum Solar Hybrid6 MW4.2 km
UE-00301MD, LLC1 MW6.1 km
IGS CC, LLC2 MW6.2 km
Central Utility Plant at White Oak54 MW7.2 km