PowerFin Kingsbery
Travis County, Texas · EIA plant ID 61700 · Operator: PowerFin ASL 1, LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2018
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 2.6 | 13.9% | — |
| 2019 | 3.8 | 16.6% | — |
| 2020 | 3.9 | 17.0% | — |
| 2021 | 3.9 | 17.2% | — |
| 2022 | 4.2 | 18.4% | — |
| 2023 | 3.5 | 15.4% | — |
| 2024 | 3.3 | 14.6% | — |
| 2025 | 3 | 13.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PFPKB | Solar Photovoltaic | PV | 2.6 | 2.6 | Mar 2018 | Operating | — | coming soon |
Owner / operator
Operator: PowerFin ASL 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| PowerFin ASL 1, LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Kingsberry Energy Storage System | 2 MW | 0.1 km |
| Robert Mueller Energy Center | 6 MW | 4.9 km |
| Hal C Weaver Power Plant | 152 MW | 5.4 km |
| System Control Center | 5 MW | 5.6 km |
| ABIA Parking Structure | 2 MW | 7 km |
| GFTX BESS | 125 MW | 7.6 km |