Wimauma Solar and Battery Storage

Hillsborough County, Florida · EIA plant ID 61667 · Operator: Tampa Electric Co
SolarBatteriesSolar PhotovoltaicBA: TEC
Nameplate115MWSummer 115 MW
Generators2in service
Net generation136GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202721.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020116.523.6%—
2021135.820.7%—
2022120.918.4%—
2023129.519.8%—
2024117.317.8%—
2025106.316.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV74.874.8Apr 2020Operating—coming soon
BESS1BatteriesBA4040Apr 2025Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%115 MW

Nearby plants

Within 80 km.
Keene Branch Solar—4.6 km
Bullfrog Creek Solar75 MW5 km
Cottonmouth Ranch Solar75 MW5.4 km
Grange Hall Solar61 MW10.7 km
Elder Branch75 MW11.6 km
Balm Solar74 MW11.7 km