Whirlpool Corp-Greenville Wind Farm
Darke County, Ohio · EIA plant ID 61660 · Operator: OEE XXVI LLC
Nameplate5MWSummer 5 MW
Generators3in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2018
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 2.5 | 19.4% | — |
| 2019 | 10.4 | 26.4% | — |
| 2020 | 10.6 | 26.7% | — |
| 2021 | 10.8 | 27.5% | — |
| 2022 | 11.9 | 30.2% | — |
| 2023 | 10.3 | 26.0% | — |
| 2024 | 6.4 | 16.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WTG1 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Sep 2018 | Operating | — | goldwind GW 87/1500 |
| WTG2 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Sep 2018 | Operating | — | goldwind GW 87/1500 |
| WTG3 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Sep 2018 | Operating | — | goldwind GW 87/1500 |
Owner / operator
Operator: OEE XXVI LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| OEE XXVI LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Greenville Electric Generating Station | 236 MW | 6.2 km |
| DG AMP Solar Versailles | 2 MW | 13.8 km |
| Versailles Peaking | 5 MW | 15.3 km |
| Arcanum Peaking | retired | 16.8 km |
| Arcanum | retired | 16.9 km |
| Union City Wind Turbine | retired | 18.8 km |