ArcanumRetired

Darke County, Ohio · EIA plant ID 2902 · Operator: City of Arcanum - (OH)
OilPJMBA: PJM

×1 MW oil retired since 2020 (latest Mar 2022)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510MWh20012003200520072009201120132015201720192021

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%0%0%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,00014,00016,000200520102015
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.10.5%12,000
200200.3%11,625
200300.3%11,772
200400.3%11,945
20050.10.4%10,904
200600.3%11,750
200700.3%11,788
200800.1%15,059
200900.2%12,967
201000.1%14,231
201100.2%11,520
201200.2%14,238
201300.1%11,778
201400.1%11,000
201500.1%12,154
201600.1%11,333
201700.1%10,214
201800.0%15,750
201900.0%—
202000.0%—
202100.0%—
202200.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC0.70.8Sep 1951Retired Mar 2022—coming soon
2Petroleum LiquidsIC0.50.6Oct 1946Retired Mar 2022—coming soon

Owner / operator

Operator: City of Arcanum - (OH). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Arcanum Peakingretired0.1 km
Greenville Electric Generating Station236 MW11.4 km
Whirlpool Corp-Greenville Wind Farm5 MW16.9 km
DG AMP Solar Versailles2 MW26.5 km
Versailles Peaking5 MW27.3 km
Richmond Solar Site 27 MW28.3 km