← Back to map

Falmouth Landfill Solar

Barnstable County, Massachusetts · EIA plant ID 61562 · Operator: Citizens Enterprises Corporation
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202618.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20173.718.7%—
20184.918.5%—
20194.918.7%—
20205.219.7%—
20214.115.5%—
20224.818.2%—
20234.517.2%—
20244.918.7%—
20254.718.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FAL1Solar PhotovoltaicPV33Apr 2017Operating—coming soon

Owner / operator

Operator: Citizens Enterprises Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Citizens Solar Holdings V, LLC100.0%3 MW

Nearby plants

Within 80 km.
Falmouth 2 Solar2 MW0.2 km
Notus Wind 12 MW0.9 km
Blacksmith Road Solar 17 MW1.1 km
MA Military Reservation Wind Project5 MW6.1 km
Green Meadows4 MW8.6 km
118 Echo1 MW9.4 km