Facebook 3 Solar Energy Center
Bernalillo County, New Mexico · EIA plant ID 61558 · Operator: Exus New Mexico
Nameplate10MWSummer 10 MW
Generators1in service
Net generation28GWh12 mo to Dec 2025
Capacity factor32%solar units, summer MW
Heat rate—thermal plants only
First online2018
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 22.9 | 34.6% | — |
| 2019 | 24.6 | 28.1% | — |
| 2020 | 26.3 | 30.0% | — |
| 2021 | 27.4 | 31.3% | — |
| 2022 | 27.7 | 31.7% | — |
| 2023 | 26.9 | 30.7% | — |
| 2024 | 27.9 | 31.8% | — |
| 2025 | 27.7 | 31.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| FB3 | Solar Photovoltaic | PV | 10 | 10 | Apr 2018 | Operating | — | coming soon |
Owner / operator
Operator: Exus New Mexico. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Exus New Mexico | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| Facebook 2 Solar Energy Center | 10 MW | 0.6 km |
| Santolina Solar Energy Center | 11 MW | 5.1 km |
| Atrisco Solar LLC | 300 MW | 12.7 km |
| City of Rio Rancho WWTP | 1 MW | 12.8 km |
| Corazon Energy Storage | — | 13.7 km |
| Oso Negro | — | 13.8 km |