San Luis Solar Garden

Conejos County, Colorado · EIA plant ID 61472 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: PSCO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202628.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20170.920.4%—
20183.331.9%—
20193.230.7%—
20203.331.8%—
20213.331.5%—
20223.129.7%—
20233.330.9%—
20243.129.1%—
2025328.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ANTO2Solar PhotovoltaicPV1.21.2Aug 2017Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%1 MW

Nearby plants

Within 80 km.
Conejos 1 Community Solar Array2 MW14.6 km
Blue Sky One1 MW18.1 km
Rock Creek 2 CSG2 MW38.2 km
Oak Leaf Solar XXX LLC (CSG)2 MW44.6 km
Alamosa53 MW44.9 km
Alamosa Solar South CSG2 MW44.9 km