← Back to map

Palmer Solar Center

Fluvanna County, Virginia · EIA plant ID 61457 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202623.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20170.26.0%—
201810.323.6%—
201911.225.5%—
202010.523.8%—
202111.426.1%—
202211.125.3%—
202310.925.0%—
20249.722.0%—
202510.223.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PALMSolar PhotovoltaicPV55Dec 2017Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%5 MW

Nearby plants

Within 80 km.
Cunningham Solar LLC5 MW11.8 km
Rivanna Solar13 MW14.8 km
Louisa Generation Facility546 MW16.8 km
Tenaska Virginia Generating Station1,011 MW17.3 km
Desper Solar88 MW17.3 km
Gordonsville Energy LP300 MW17.7 km