Amazon - Patterson PV

Stanislaus County, California · EIA plant ID 61377 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: BANC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202622.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20173.524.1%—
20187.233.0%—
20195.324.0%—
20204.520.6%—
20212.712.3%—
202200.0%—
20232.210.0%—
20244.822.0%—
20254.922.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PATT1Solar PhotovoltaicPV2.52.5May 2017Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%3 MW

Nearby plants

Within 80 km.
Enchanted Rock Turlock Irrigation Distri47 MW4.8 km
Proxima352 MW7.6 km
Covanta Stanislaus Energyretired9.6 km
Frontier Solar LLC20 MW10.4 km
Paulsell35 MW10.9 km
Aurora Renewable Energy (Hybrid)—19.7 km