Stanislaus County, California · EIA plant ID 60039 · Operator: Boralex US Operations LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation48GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202627.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201628.427.7%—
201751.329.3%—
201853.230.4%—
201952.129.7%—
202049.628.2%—
202151.429.3%—
202246.626.6%—
202340.122.9%—
202438.622.0%—
202547.927.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FTRSSolar PhotovoltaicPV2020Jun 2016Operating—coming soon

Owner / operator

Operator: Boralex US Operations LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Boralex Frontier Solar California LLC50.0%10 MW
GSPPR LLC50.0%10 MW

Nearby plants

Within 80 km.
Paulsell35 MW0.8 km
Covanta Stanislaus Energyretired1.1 km
Proxima352 MW3.6 km
Enchanted Rock Turlock Irrigation Distri47 MW6.2 km
Amazon - Patterson PV3 MW10.4 km