← Back to map

Theodore Drive Community Solar

Worcester County, Massachusetts · EIA plant ID 61296 · Operator: Theodore Drive Solar, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20172019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20182019202020212022202320242025202618.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20170——
20182.219.7%—
20192.418.5%—
20202.518.7%—
20212.418.0%—
20222.518.7%—
20232.417.9%—
20242.518.6%—
20252.418.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2529Solar PhotovoltaicPV1.51.5Mar 2018Operating—coming soon

Owner / operator

Operator: Theodore Drive Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Theodore Drive Solar, LLC100.0%2 MW

Nearby plants

Within 80 km.
AIS Solar Project3 MW5.1 km
Fitchburg Gas Recovery5 MW5.6 km
Anderson Power Products Divisionretired5.6 km
Pinetree Power Fitchburg18 MW6.4 km
TES Rowtier3 MW6.6 km
Brockelman3 MW7.1 km