Pinetree Power Fitchburg

Worcester County, Massachusetts · EIA plant ID 54620 · Operator: NE Renewable Fitchburg, LLC
OtherWood/Wood Waste BiomassISONEBA: ISNE
Nameplate18MWSummer 15 MW
Generators1in service
Net generation79GWh12 mo to Dec 2025
Capacity factor59%other units, summer MW
Heat rate23,099Btu/kWhfossil units, electric fuel, HHV
First online1992

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202559.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
15,00020,00025,000201420162018202020222024202623,099 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001142.595.7%—
2002128.386.2%—
2003136.391.5%—
2004127.185.1%—
200513590.6%—
2006136.591.7%—
2007127.985.9%—
2008130.387.2%—
2009122.482.2%—
2010128.586.3%—
2011106.471.4%—
2012104.974.7%—
201375.753.8%17,686
201412488.3%17,926
2015118.684.4%16,504
2016128.591.3%16,965
2017130.292.9%17,500
2018106.375.8%18,626
201991.767.1%19,718
2020104.779.5%19,268
202173.953.6%24,969
202246.334.5%19,635
202336.427.2%21,271
202461.245.9%22,712
202578.759.5%23,099

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NO-1Wood/Wood Waste BiomassST1814.9Aug 1992Operating—coming soon

Owner / operator

Operator: NE Renewable Fitchburg, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NE Renewable Fitchburg, LLC100.0%18 MW

Nearby plants

Within 80 km.
TES Rowtier3 MW0.3 km
Fitchburg Gas Recovery5 MW0.9 km
Newark America Millretired2.1 km
Syncarpha Westminster Hybrid CSG8 MW5.7 km
Westminster Renewables, LLC CSG2 MW5.8 km
Overlook5 MW6.1 km