Fort Myers

Lee County, Florida · EIA plant ID 612 · Operator: Florida Power & Light Co
Natural gasNatural Gas Fired Combined CycleNatural Gas Fired Combustion TurbinePetroleum Liquids⛽ Dual-fuelBA: FPL
Nameplate2,681MWSummer 2,736 MW
Generators14in service
Net generation9,343GWh12 mo to Aug 2026
Capacity factor39%gas/coal/oil units, summer MW
Heat rate7,519Btu/kWhfossil units, electric fuel, HHV
First online1958Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02505007501,000GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202539.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0007,2507,5007,7508,000200520102015202020257,519 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20013,499.5——
20026,578.2——
200310,868.857.3%7,325
20049,92247.1%7,276
20059,818.646.4%7,212
200610,121.347.8%7,284
20079,669.345.8%7,301
20089,336.844.1%7,269
20099,339.844.2%7,395
20109,086.843.2%7,549
20117,419.835.4%7,926
20129,189.343.7%7,450
20137,565.536.1%7,808
20148,843.742.1%7,417
20158,167.338.9%7,462
20169,370.343.8%7,337
20178,855.442.7%7,314
20189,287.242.3%7,257
20198,419.635.0%7,730
20209,744.540.6%7,150
20219,841.741.1%7,239
202210,511.243.9%7,267
20239,81040.9%7,393
20249,764.840.6%7,737
20258,971.137.4%7,730

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo388,374 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas758
Net summer MW on oil768
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2ANatural Gas Fired Combined CycleCT188.2199.5Dec 2000Operating—coming soon
2BNatural Gas Fired Combined CycleCT188.2197.4Dec 2000Operating—coming soon
2CNatural Gas Fired Combined CycleCT188.2197.4Dec 2000Operating—coming soon
2DNatural Gas Fired Combined CycleCT188.2197.4Apr 2001Operating—coming soon
2ENatural Gas Fired Combined CycleCT188.2197.4May 2001Operating—coming soon
2FNatural Gas Fired Combined CycleCT188.2197.4May 2001Operating—coming soon
9Petroleum LiquidsGT6254May 1974Operating—coming soon
CT1Natural Gas Fired Combustion TurbineGT188.2182Jun 2003Operating—coming soon
CT2Natural Gas Fired Combustion TurbineGT188.2182Jun 2003Operating—coming soon
GT1Petroleum LiquidsGT6254May 1974Operating—coming soon
PFM3CNatural Gas Fired Combustion TurbineGT229.5231Dec 2016Operating—coming soon
PFM3DNatural Gas Fired Combustion TurbineGT229.5231Dec 2016Operating—coming soon
ST1Natural Gas Fired Combined CycleCA156.2155.8Nov 1958Operating—coming soon
ST2Natural Gas Fired Combined CycleCA436.1459.2Jul 1969Operating—coming soon
11Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
12Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
3Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
4Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
5Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
6Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
7Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
8Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
G10Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon
GT2Petroleum LiquidsGT6254May 1974Retired Dec 2016—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Power & Light Co100.0%2,681 MW

Nearby plants

Within 80 km.
Lee County Solid Waste Energy59 MW7.6 km
Babcock Preserve75 MW18.1 km
Babcock Solar Energy Center Hybrid85 MW18.6 km
Port Charlotte Energy LLC3 MW20.9 km
Green Pasture75 MW36.3 km
Goldenrod75 MW37.6 km