Lee County Solid Waste EnergyRetirement planned

Lee County, Florida · EIA plant ID 52010 · Operator: Lee County Board-Commissioners
OtherMunicipal Solid WasteBA: FPL
Nameplate59MWSummer 55 MW
Generators2in service
Net generation315GWh12 mo to Aug 2026
Capacity factor65%other units, summer MW
Heat rate18,197Btu/kWhfossil units, electric fuel, HHV
First online1994Retirement planned Sep 2029

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202564.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
16,00018,00020,00022,000201020152020202518,197 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001226.966.4%—
2002259.375.9%—
2003252.173.8%—
2004251.173.3%—
200523368.2%—
2006219.764.3%—
2007217.754.4%—
2008283.758.5%17,910
2009295.961.2%16,649
2010292.960.6%17,076
201128959.8%16,833
2012296.861.2%17,191
2013321.366.5%17,023
2014328.268.0%17,650
2015329.168.1%17,557
2016340.770.4%18,099
2017315.365.2%18,691
2018347.671.9%17,618
2019338.569.4%18,726
2020277.757.2%21,256
2021327.467.7%17,400
2022285.859.1%20,758
2023274.156.5%19,601
2024224.846.1%21,837
2025302.462.3%18,422

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Municipal Solid WasteST3939Sep 1994Operating · retirement plannedSep 2029coming soon
GEN2Municipal Solid WasteST2016Aug 2007Operating · retirement plannedAug 2072coming soon

Owner / operator

Operator: Lee County Board-Commissioners. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Lee County Board-Commissioners100.0%59 MW

Nearby plants

Within 80 km.
Fort Myers2,681 MW7.6 km
Babcock Preserve75 MW25.2 km
Babcock Solar Energy Center Hybrid85 MW25.6 km
Port Charlotte Energy LLC3 MW27 km
Goldenrod75 MW31.6 km
Boardwalk75 MW33.5 km