← Back to map

Battle Mountain Solar Project

Humboldt County, Nevada · EIA plant ID 61098 · Operator: RWE Clean Energy
SolarBatteriesSolar PhotovoltaicBA: NEVP
Nameplate126MWSummer 126 MW
Generators2in service
Net generation276GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202120222023202420252026202731.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2021192.432.5%—
2022268.330.5%—
2023255.529.1%—
2024289.832.9%—
2025271.931.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BMBSBatteriesBA2525Jun 2021Operating—coming soon
BMSPSolar PhotovoltaicPV101101May 2021Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%126 MW

Nearby plants

Within 80 km.
North Valmy567 MW19.6 km
Beowawe Power35 MW41.6 km
TS Power Plant442 MW44.9 km