TS Power Plant
Eureka County, Nevada · EIA plant ID 56224 · Operator: Newmont Nevada Energy Investment, LLC
Nameplate442MWSummer 418 MW
Generators3in service
Net generation1,623GWh12 mo to Aug 2026
Capacity factor60%gas/coal/oil units, summer MW
Heat rate10,009Btu/kWhfossil units, electric fuel, HHV
First online2008Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2008 | 931.9 | 80.0% | 9,439 |
| 2009 | 1,170 | 58.9% | 9,754 |
| 2010 | 1,416.4 | 74.0% | 9,787 |
| 2011 | 1,319.1 | 69.0% | 9,975 |
| 2012 | 1,120.7 | 58.4% | 10,266 |
| 2013 | 1,395.1 | 72.9% | 9,872 |
| 2014 | 1,424.3 | 74.5% | 10,080 |
| 2015 | 856.8 | 44.8% | 10,744 |
| 2016 | 890.7 | 46.4% | 10,868 |
| 2017 | 967.8 | 50.6% | 10,870 |
| 2018 | 1,045.4 | 54.6% | 10,577 |
| 2019 | 1,049.1 | 54.8% | 10,296 |
| 2020 | 1,027.3 | 53.5% | 10,488 |
| 2021 | 1,192.3 | 62.3% | 10,011 |
| 2022 | 1,342.5 | 70.2% | 9,872 |
| 2023 | 1,085.8 | 56.8% | 10,230 |
| 2024 | 1,364.2 | 60.7% | 10,191 |
| 2025 | 1,718 | 68.1% | 10,163 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Steam Coal | ST | 242 | 218.4 | Jun 2008 | Operating | — | coming soon |
| SOL1 | Solar Photovoltaic | PV | 100 | 100 | Apr 2024 | Operating | — | coming soon |
| SOL2 | Solar Photovoltaic | PV | 100 | 100 | Sep 2024 | Operating | — | coming soon |
Owner / operator
Operator: Newmont Nevada Energy Investment, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Newmont Nevada Energy Investment, LLC | 100.0% | 442 MW |
Nearby plants
Within 80 km.
| Beowawe Power | 35 MW | 22.5 km |
| Battle Mountain Solar Project | 126 MW | 44.9 km |
| North Valmy | 567 MW | 54.5 km |