← Back to map

Roaring Brook, LLC

Lewis County, New York · EIA plant ID 61041 · Operator: Avangrid Renewables Inc
WindOnshore Wind TurbineNYISOBA: NYIS
Nameplate80MWSummer 80 MW
Generators1in service
Net generation192GWh12 mo to Aug 2026
Capacity factor28%wind units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202120222023202420252026202727.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202130.917.5%—
2022179.225.7%—
2023170.124.4%—
2024163.123.3%—
2025207.829.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WT1Onshore Wind TurbineWT79.779.7Oct 2021Operating—siemens gamesa SG 4.5-145

Owner / operator

Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Avangrid Renewables Inc100.0%80 MW

Nearby plants

Within 80 km.
Maple Ridge Wind Farm321 MW9 km
Martinsburg CSG LLC2 MW11.9 km
Chambers 3 - Lewis County2 MW12.2 km
Number Three Wind Project106 MW14.9 km
Copenhagen Solar3 MW19 km
GSPP 9605 E Rd N, LLC2 MW19.6 km