Number Three Wind Project
Lewis County, New York · EIA plant ID 65522 · Operator: Invenergy Services LLC
Nameplate106MWSummer 106 MW
Generators1in service
Net generation275GWh12 mo to Aug 2026
Capacity factor30%wind units, summer MW
Heat rate—thermal plants only
First online2023
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 137.7 | 22.1% | — |
| 2024 | 272.6 | 29.3% | — |
| 2025 | 295 | 31.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 65013 | Onshore Wind Turbine | WT | 106 | 106 | May 2023 | Operating | — | vestas V150-4.2 |
Owner / operator
Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Invenergy Services LLC | 100.0% | 106 MW |
Nearby plants
Within 80 km.
| GSPP 9605 E Rd N, LLC | 2 MW | 4.9 km |
| GSPP 9557 E Rd S, LLC | 2 MW | 5.1 km |
| Maple Ridge Wind Farm | 321 MW | 6.1 km |
| Chambers 3 - Lewis County | 2 MW | 8.7 km |
| Copenhagen Plant | 3 MW | 9.9 km |
| Kings Falls Hydroelectric | 2 MW | 10 km |