Buckthorn Wind

Erath County, Texas · EIA plant ID 60983 · Operator: Buckthorn Wind Project, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate101MWSummer 101 MW
Generators1in service
Net generation388GWh12 mo to Aug 2026
Capacity factor44%wind units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2018202020222024202644.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201725.834.5%—
2018363.941.3%—
2019408.646.4%—
2020407.346.1%—
2021343.439.0%—
2022355.740.4%—
2023368.441.8%—
2024357.740.5%—
2025359.640.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BWINDOnshore Wind TurbineWT100.5100.5Dec 2017Operating—vestas V126-3.45

Owner / operator

Operator: Buckthorn Wind Project, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Buckthorn Wind Project, LLC100.0%101 MW

Nearby plants

Within 80 km.
Silver Star I Wind Power Project53 MW12.2 km
TPE Erath Solar, LLC10 MW20 km
R W Miller604 MW32.5 km
Erath County Solar—36.5 km
La Casa Wind150 MW40.6 km
Darkwood Solar—49.4 km