← Back to map

CSUF Nutwood Solar

Orange County, California · EIA plant ID 60979 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201601.2%—
20172.414.5%—
20183.219.2%—
2019318.3%—
20203.219.0%—
20213.420.3%—
20223.420.2%—
20232.615.6%—
20243.118.3%—
20252.917.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.91.9Dec 2016Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wells Fargo Equipment Finance Inc100.0%2 MW

Nearby plants

Within 80 km.
CSUF State College1 MW0 km
CSUF Trigeneration9 MW0.3 km
Fullerton Mill CHPretired2 km
Canyon Power Plant200 MW3.4 km
Kaiser East La Palma Ave. Fuel Cell2 MW5.1 km
Kroger La Habra1 MW5.2 km