Jacobson 5 MW Solar
Mohave County, Arizona · EIA plant ID 60603 · Operator: UNS Electric, Inc
Nameplate4MWSummer 4 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2017
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 7.9 | 24.3% | — |
| 2018 | 7.8 | 20.2% | — |
| 2019 | 9.5 | 24.5% | — |
| 2020 | 8.7 | 22.6% | — |
| 2021 | 9.4 | 24.3% | — |
| 2022 | 9.4 | 24.4% | — |
| 2023 | 8.3 | 21.6% | — |
| 2024 | 9.6 | 24.9% | — |
| 2025 | 8.9 | 23.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 4.4 | 4.4 | Mar 2017 | Operating | — | coming soon |
Owner / operator
Operator: UNS Electric, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| UNS Electric, Inc | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| La Senita | 1 MW | 7 km |
| Gray Hawk Solar | 55 MW | 12.2 km |
| Kingman 1 | 11 MW | 18.4 km |
| Sierra Solar | — | 20.4 km |
| Kingman Energy Storage | 50 MW | 24.8 km |