← Back to map

Sweetheart Lake Hydroelectric FacilityPlanned

Juneau County, Alaska · EIA plant ID 60588 · Operator: Juneau Hydropower, Inc
Hydro

20 MW planned (Conventional Hydroelectric), first expected Jan 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
JHI01Conventional HydroelectricHY6.66.6planned Jan 2028Planned—coming soon
JHI02Conventional HydroelectricHY6.66.6planned Jan 2028Planned—coming soon
JHI03Conventional HydroelectricHY6.66.6planned Jan 2028Planned—coming soon

Owner / operator

Operator: Juneau Hydropower, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Snettisham78 MW22.1 km
Lake Dorothy Hydroelectric Project14 MW38.6 km
Annex Creek4 MW48.1 km
Gold Creek10 MW59.1 km
Salmon Creek 19 MW62.3 km
Lemon Creek62 MW65.7 km