← Back to map

Innovative Solar 42

Bladen County, North Carolina · EIA plant ID 60539 · Operator: Novis Renewables, LLC
SolarSolar PhotovoltaicBA: CPLE
Nameplate71MWSummer 71 MW
Generators1in service
Net generation81GWh12 mo to Aug 2026
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202613.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201727.713.4%—
2018133.421.4%—
2019131.721.2%—
2020131.121.0%—
2021140.422.6%—
202214222.8%—
2023139.622.4%—
2024124.420.0%—
202594.615.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
IS042Solar PhotovoltaicPV7171Sep 2017Operating—coming soon

Owner / operator

Operator: Novis Renewables, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novis Renewables, LLC100.0%71 MW

Nearby plants

Within 80 km.
DD Fayetteville Solar NC LLC23 MW3.4 km
Butler10 MW5.9 km
Robeson County LFG to Energy2 MW6.9 km
Panda Solar NC 11, LLC2 MW7.5 km
Panda Solar NC 10, LLC2 MW7.6 km
Panda Solar NC 9, LLC2 MW7.8 km