DD Fayetteville Solar NC LLC
Bladen County, North Carolina · EIA plant ID 59117 · Operator: Duke Energy Progress - (NC)
Nameplate23MWSummer 23 MW
Generators1in service
Net generation39GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2015
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 1 | 2.9% | — |
| 2016 | 36 | 17.7% | — |
| 2017 | 35.6 | 17.6% | — |
| 2018 | 23.1 | 11.4% | — |
| 2019 | 32.6 | 16.1% | — |
| 2020 | 39.3 | 19.4% | — |
| 2021 | 40.9 | 20.2% | — |
| 2022 | 37.4 | 18.5% | — |
| 2023 | 41.3 | 20.4% | — |
| 2024 | 37.9 | 18.7% | — |
| 2025 | 39.4 | 19.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 23.1 | 23.1 | Nov 2015 | Operating | — | coming soon |
Owner / operator
Operator: Duke Energy Progress - (NC). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Progress - (NC) | 100.0% | 23 MW |
Nearby plants
Within 80 km.
| Innovative Solar 42 | 71 MW | 3.4 km |
| Robeson County LFG to Energy | 2 MW | 7.7 km |
| Butler | 10 MW | 8.7 km |
| Railroad Farm 2 | 5 MW | 10.2 km |
| Smithfield Farmland Corp Bladen | 29 MW | 10.4 km |
| Panda Solar NC 11, LLC | 2 MW | 10.4 km |