← Back to map

DD Fayetteville Solar NC LLC

Bladen County, North Carolina · EIA plant ID 59117 · Operator: Duke Energy Progress - (NC)
SolarSolar PhotovoltaicBA: DUK
Nameplate23MWSummer 23 MW
Generators1in service
Net generation39GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202619.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201512.9%—
20163617.7%—
201735.617.6%—
201823.111.4%—
201932.616.1%—
202039.319.4%—
202140.920.2%—
202237.418.5%—
202341.320.4%—
202437.918.7%—
202539.419.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV23.123.1Nov 2015Operating—coming soon

Owner / operator

Operator: Duke Energy Progress - (NC). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Progress - (NC)100.0%23 MW

Nearby plants

Within 80 km.
Innovative Solar 4271 MW3.4 km
Robeson County LFG to Energy2 MW7.7 km
Butler10 MW8.7 km
Railroad Farm 25 MW10.2 km
Smithfield Farmland Corp Bladen29 MW10.4 km
Panda Solar NC 11, LLC2 MW10.4 km