← Back to map

Red Rock

Maricopa County, Arizona · EIA plant ID 60467 · Operator: Arizona Public Service Co
SolarBatteriesSolar PhotovoltaicBA: AZPS
Nameplate85MWSummer 85 MW
Generators2in service
Net generation91GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202624.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2017114.735.8%—
201812034.3%—
2019116.233.1%—
2020115.632.9%—
2021118.433.8%—
2022105.330.1%—
2023267.4%—
202491.323.8%—
202585.923.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV43.943.9Feb 2017Operating—coming soon
RR40MBatteriesBA4141Nov 2023Operating—coming soon

Owner / operator

Operator: Arizona Public Service Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arizona Public Service Co100.0%85 MW

Nearby plants

Within 80 km.
Saguaro185 MW1 km
Serrano384 MW5.6 km
Avra Valley Solar25 MW20 km
Picture Rocks Solar, LLC20 MW20.6 km
North Loop108 MW22.6 km
Kitt Solar—33.1 km