SolarSolar PhotovoltaicBA: TEPC
Nameplate25MWSummer 25 MW
Generators1in service
Net generation61GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202628.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20122.1——
201375.834.6%—
201474.233.9%—
201558.426.7%—
201674.834.1%—
201773.733.7%—
201872.233.0%—
201968.431.2%—
202065.329.7%—
202167.230.7%—
202263.829.1%—
202364.829.6%—
202462.528.5%—
202561.528.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2525Jan 2013Operating—coming soon

Owner / operator

Operator: avra valley solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
avra valley solar100.0%25 MW

Nearby plants

Within 80 km.
Picture Rocks Solar, LLC20 MW3.8 km
Broadway 3 - Tucson Phase I1 MW13.9 km
Broadway 2 - Tucson Phase II3 MW13.9 km
Tucson - CAVSARP7 MW14.1 km
Serrano384 MW14.7 km
North Loop108 MW15.1 km