Providence Solar

Madison County, Tennessee · EIA plant ID 60337 · Operator: Providence Solar Center, LLC
SolarSolar PhotovoltaicBA: TVA
Nameplate16MWSummer 16 MW
Generators1in service
Net generation31GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh2016201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202622.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160——
20173.29.1%—
201830.922.1%—
201930.121.5%—
202029.921.3%—
202130.421.7%—
202232.122.9%—
20232417.1%—
202428.720.4%—
202530.521.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PROVSolar PhotovoltaicPV1616Oct 2017Operating—coming soon

Owner / operator

Operator: Providence Solar Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Providence Solar Center, LLC100.0%16 MW

Nearby plants

Within 80 km.
SR Denmark—10.6 km
SR McKellar70 MW11 km
SR Jackson II1 MW12.3 km
Brownsville Peaking Power460 MW14.1 km
SR Brownsville3 MW16.8 km
Haywood Solar3 MW21.6 km