Brownsville Peaking Power

Haywood County, Tennessee · EIA plant ID 55081 · Operator: Tennessee Valley Authority
Natural gasNatural Gas Fired Combustion TurbineBA: TVA
Nameplate460MWSummer 456 MW
Generators4in service
Net generation119GWh12 mo to Dec 2025
Capacity factor3%gas/coal/oil units, summer MW
Heat rate12,039Btu/kWhfossil units, electric fuel, HHV
First online1999Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-250255075100GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%200520102015202020253.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,0007,50010,00012,50015,0002005201020152020202512,039 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200165.6——
200229——
2003220.6%12,163
200410.30.3%12,954
200513.50.3%12,653
200643.41.1%11,362
200755.71.4%11,933
20082.30.1%13,157
200919.70.5%13,613
2010289.87.1%12,093
2011223.45.5%12,937
2012382.19.5%11,616
201377.71.9%11,918
2014152.43.8%11,649
2015243.66.1%11,426
2016498.812.4%11,017
2017316.57.9%11,423
2018579.214.5%11,487
2019489.312.3%14,311
2020476.711.9%7,794
2021360.39.0%10,060
202294.62.4%—
202321.10.5%—
202467.51.7%—
2025119.43.0%12,039

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT112110Jun 1999Operating—coming soon
2Natural Gas Fired Combustion TurbineGT112110Jun 1999Operating—coming soon
3Natural Gas Fired Combustion TurbineGT118118Jun 1999Operating—coming soon
4Natural Gas Fired Combustion TurbineGT118118Jun 1999Operating—coming soon

Owner / operator

Operator: Tennessee Valley Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tennessee Valley Authority100.0%460 MW

Nearby plants

Within 80 km.
SR Brownsville3 MW6 km
Haywood Solar3 MW8.9 km
Providence Solar16 MW14.1 km
Lagoon Creek1,625 MW22 km
West Tennessee Solar Farm4 MW22.8 km
SR Denmark—24.1 km