← Back to map

Trinity Solar

Randolph County, North Carolina · EIA plant ID 60291 · Operator: Trinity Solar, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202622.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20192.413.2%—
20208.820.4%—
20219.722.5%—
20229.422.0%—
20238.820.4%—
20247.417.3%—
20259.622.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV54.9Aug 2019Operating—coming soon

Owner / operator

Operator: Trinity Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Trinity Solar, LLC100.0%5 MW

Nearby plants

Within 80 km.
High Point, Fairfield2 MW8.2 km
Eastside WWTP5 MW8.3 km
High Point, POLO2 MW11.5 km
Ward WTP2 MW11.5 km
High Point, Pump Station Rd4 MW13 km
Millikan Farm5 MW15.3 km