Trinity Solar
Randolph County, North Carolina · EIA plant ID 60291 · Operator: Trinity Solar, LLC
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2019
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 2.4 | 13.2% | — |
| 2020 | 8.8 | 20.4% | — |
| 2021 | 9.7 | 22.5% | — |
| 2022 | 9.4 | 22.0% | — |
| 2023 | 8.8 | 20.4% | — |
| 2024 | 7.4 | 17.3% | — |
| 2025 | 9.6 | 22.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 5 | 4.9 | Aug 2019 | Operating | — | coming soon |
Owner / operator
Operator: Trinity Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Trinity Solar, LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| High Point, Fairfield | 2 MW | 8.2 km |
| Eastside WWTP | 5 MW | 8.3 km |
| High Point, POLO | 2 MW | 11.5 km |
| Ward WTP | 2 MW | 11.5 km |
| High Point, Pump Station Rd | 4 MW | 13 km |
| Millikan Farm | 5 MW | 15.3 km |