← Back to map

Eastside WWTP

Guilford County, North Carolina · EIA plant ID 57606 · Operator: Town Of High Point
OilPetroleum LiquidsBA: DUK
Nameplate5MWSummer 5 MW
Generators3in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate10,402Btu/kWhfossil units, electric fuel, HHV
First online2004Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100MWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%2010201220142016201820202022202420260.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,00020,00020102012201420162018202020222024202610,402 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201000.0%10,500
201100.0%10,500
201200.0%11,000
201300.0%20,000
201400.0%20,333
201500.0%—
20160.20.4%9,966
20170.40.8%10,842
20180.20.5%9,860
20190.20.4%11,225
20200.30.5%8,728
20210.40.9%9,546
20220.30.6%10,870
20230.20.4%9,305
20240.30.6%10,783
20250.40.9%10,402

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsIC1.81.8Aug 2004Operating—coming soon
2Petroleum LiquidsIC1.81.8Aug 2004Operating—coming soon
3Petroleum LiquidsIC1.81.8Aug 2004Operating—coming soon

Owner / operator

Operator: Town Of High Point. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Town Of High Point100.0%5 MW

Nearby plants

Within 80 km.
High Point, POLO2 MW5.5 km
High Point, Pump Station Rd4 MW6.1 km
Ward WTP2 MW6.2 km
High Point, Fairfield2 MW7.6 km
Trinity Solar5 MW8.3 km
Westside WWTP2 MW18.2 km