Eastside WWTP
Guilford County, North Carolina · EIA plant ID 57606 · Operator: Town Of High Point
Nameplate5MWSummer 5 MW
Generators3in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate10,402Btu/kWhfossil units, electric fuel, HHV
First online2004Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2010 | 0 | 0.0% | 10,500 |
| 2011 | 0 | 0.0% | 10,500 |
| 2012 | 0 | 0.0% | 11,000 |
| 2013 | 0 | 0.0% | 20,000 |
| 2014 | 0 | 0.0% | 20,333 |
| 2015 | 0 | 0.0% | — |
| 2016 | 0.2 | 0.4% | 9,966 |
| 2017 | 0.4 | 0.8% | 10,842 |
| 2018 | 0.2 | 0.5% | 9,860 |
| 2019 | 0.2 | 0.4% | 11,225 |
| 2020 | 0.3 | 0.5% | 8,728 |
| 2021 | 0.4 | 0.9% | 9,546 |
| 2022 | 0.3 | 0.6% | 10,870 |
| 2023 | 0.2 | 0.4% | 9,305 |
| 2024 | 0.3 | 0.6% | 10,783 |
| 2025 | 0.4 | 0.9% | 10,402 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Petroleum Liquids | IC | 1.8 | 1.8 | Aug 2004 | Operating | — | coming soon |
| 2 | Petroleum Liquids | IC | 1.8 | 1.8 | Aug 2004 | Operating | — | coming soon |
| 3 | Petroleum Liquids | IC | 1.8 | 1.8 | Aug 2004 | Operating | — | coming soon |
Owner / operator
Operator: Town Of High Point. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Town Of High Point | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| High Point, POLO | 2 MW | 5.5 km |
| High Point, Pump Station Rd | 4 MW | 6.1 km |
| Ward WTP | 2 MW | 6.2 km |
| High Point, Fairfield | 2 MW | 7.6 km |
| Trinity Solar | 5 MW | 8.3 km |
| Westside WWTP | 2 MW | 18.2 km |