← Back to map

Hemlock Solar

Northampton County, North Carolina · EIA plant ID 60207 · Operator: Hemlock Solar LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202621.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20178.121.9%—
20181022.8%—
201910.323.5%—
20209.521.6%—
20219.621.9%—
20229.321.3%—
20239.922.6%—
20249.321.2%—
20259.421.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HEMLKSolar PhotovoltaicPV55Mar 2017Operating—coming soon

Owner / operator

Operator: Hemlock Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hemlock Solar LLC100.0%5 MW

Nearby plants

Within 80 km.
Garysburg Solar5 MW0.5 km
Long Farm 46 Solar, LLC5 MW1.8 km
510 REPP One1 MW3.2 km
KapStone Kraft Paper Corp28 MW4 km
Cottonwood Solar, LLC3 MW4.6 km
Schell Solar Farm5 MW4.7 km