Curry County, New Mexico · EIA plant ID 60152 · Operator: Pattern Operators LP
Nameplate143MWSummer 143 MW
Generators1in service
Net generation575GWh12 mo to Aug 2026
Capacity factor46%wind units, summer MW
Heat rate—thermal plants only
First online2017
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 316.5 | 30.2% | — |
| 2018 | 582.4 | 46.6% | — |
| 2019 | 552.4 | 44.2% | — |
| 2020 | 539.6 | 43.1% | — |
| 2021 | 584.7 | 46.8% | — |
| 2022 | 552.4 | 44.2% | — |
| 2023 | 544.7 | 43.6% | — |
| 2024 | 568.3 | 45.4% | — |
| 2025 | 530.9 | 42.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 142.6 | 142.6 | Mar 2017 | Operating | — | siemens SWT-2.3-108 |
Owner / operator
Operator: Pattern Operators LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Broadview Energy KW, LLC | 100.0% | 143 MW |
Nearby plants
Within 80 km.
| Broadview Energy JN, LLC | 182 MW | 5.4 km |
| Grady Wind Energy Center, LLC | 221 MW | 6.9 km |
| Broadview Energy Prime 2 LLC | 10 MW | 12.6 km |
| Broadview Energy Prime LLC | 10 MW | 14.6 km |
| Caprock Wind Farm | 100 MW | 33 km |
| Caprock Solar 1 LLC | 25 MW | 34.4 km |