Caprock Solar 1 LLC

Quay County, New Mexico · EIA plant ID 59251 · Operator: Duke Energy Renewables Services
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate25MWSummer 24 MW
Generators1in service
Net generation62GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202628.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20163.116.8%—
20176932.3%—
201867.831.7%—
201964.330.1%—
202061.828.8%—
202151.824.2%—
20226831.8%—
202362.329.1%—
202467.831.6%—
20255726.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV2524.4Dec 2016Operating—coming soon

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Caprock Solar 1, LLC100.0%25 MW

Nearby plants

Within 80 km.
Caprock Wind Farm100 MW2.2 km
Broadview Energy Prime LLC10 MW26.7 km
Broadview Energy Prime 2 LLC10 MW29.1 km
Broadview Energy KW, LLC143 MW34.4 km
Broadview Energy JN, LLC182 MW37 km
Grady Wind Energy Center, LLC221 MW38 km