Morton County, North Dakota · EIA plant ID 60088 · Operator: Novatus Energy
WindOnshore Wind TurbineBA: WACM
Nameplate104MWSummer 104 MW
Generators1in service
Net generation430GWh12 mo to Aug 2026
Capacity factor47%wind units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20162018202020222024202647.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201662.580.8%—
2017456.450.1%—
2018425.246.7%—
2019438.348.1%—
2020464.450.8%—
202140244.1%—
2022458.850.4%—
2023404.944.5%—
2024427.546.8%—
2025431.647.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SNFLROnshore Wind TurbineWT104104Dec 2016Operating—vestas V100-2.0

Owner / operator

Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novatus Energy100.0%104 MW

Nearby plants

Within 80 km.
Glen Ullin Energy Center107 MW24.1 km
Glen Ullin Station 6retired24.3 km
Bison I Wind Energy Center82 MW42.5 km
Bison 2 Wind Energy Center105 MW42.5 km
Bison 3 Wind Energy Center105 MW42.5 km