← Back to map

Innovative Solar 10

Haywood County, North Carolina · EIA plant ID 60050 · Operator: Cypress Creek Renewables
SolarSolar PhotovoltaicBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202620.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20150.39.6%—
20162.821.5%—
20172.619.8%—
20182.519.2%—
20192.619.9%—
20202.418.2%—
20212.317.4%—
20222.620.1%—
20232.620.1%—
20242.418.4%—
20252.620.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FLS1Solar PhotovoltaicPV1.51.5Oct 2015Operating—coming soon

Owner / operator

Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Cypress Creek Renewables100.0%2 MW

Nearby plants

Within 80 km.
Canton North Carolinaretired8.1 km
Innovative Solar 64 MW26.1 km
Walters108 MW28.5 km
Biltmore Solar Fields2 MW29 km
Marshall Dam5 MW30.2 km
Bear Creek Dam9 MW30.5 km