SunE Rochester
San Bernardino County, California · EIA plant ID 60032 · Operator: SunE Solar XVI Lessor, LLC
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2016
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 1.8 | 20.1% | — |
| 2018 | 1.7 | 19.2% | — |
| 2019 | 1.6 | 17.9% | — |
| 2020 | 0 | 0.0% | — |
| 2021 | 1.2 | 13.4% | — |
| 2022 | 1.3 | 15.1% | — |
| 2023 | 0.9 | 10.3% | — |
| 2024 | 0.7 | 7.8% | — |
| 2025 | 0.9 | 10.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RCHTR | Solar Photovoltaic | PV | 1 | 1 | Aug 2016 | Operating | — | coming soon |
Owner / operator
Operator: SunE Solar XVI Lessor, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| SunE Solar XVI Lessor, LLC | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Starbucks - Evolution Fresh | retired | 0.7 km |
| Rancho Cucamonga Dist #1 | 2 MW | 0.8 km |
| Separator (Etiwanda) BESS | 113 MW | 1.2 km |
| Grapeland Hybrid | 60 MW | 1.3 km |
| Etiwanda | 24 MW | 1.8 km |
| Foundation IE | 1 MW | 2 km |