Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202610.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20171.820.1%—
20181.719.2%—
20191.617.9%—
202000.0%—
20211.213.4%—
20221.315.1%—
20230.910.3%—
20240.77.8%—
20250.910.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RCHTRSolar PhotovoltaicPV11Aug 2016Operating—coming soon

Owner / operator

Operator: SunE Solar XVI Lessor, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunE Solar XVI Lessor, LLC100.0%1 MW

Nearby plants

Within 80 km.
Starbucks - Evolution Freshretired0.7 km
Rancho Cucamonga Dist #12 MW0.8 km
Separator (Etiwanda) BESS113 MW1.2 km
Grapeland Hybrid60 MW1.3 km
Etiwanda24 MW1.8 km
Foundation IE1 MW2 km