Cabell County, West Virginia · EIA plant ID 59995 · Operator: Appalachian Power Co
BatteryPJMBA: PJM

×2 MW battery retired since 2020 (latest Apr 2021)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20-15-10-50MWh201620172018201920202021

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160——
20170——
2018-0.2——
2019-0.1——
2020-0.2——
20210——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1BatteriesBA22Nov 2009Retired Apr 2021—coming soon

Owner / operator

Operator: Appalachian Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Winfield25 MW26 km
John E Amos2,933 MW29.1 km
Ceredo Generating Station519 MW35.6 km
R.C. Byrd L&D Hydroelectric Project—35.6 km
Big Sandy Peaker Plant353 MW40.9 km
Riverside Generating LLC1,150 MW45.9 km