Latigo Wind Park
San Juan County, Utah · EIA plant ID 59965 · Operator: AES Distributed Energy
Nameplate62MWSummer 62 MW
Generators1in service
Net generation134GWh12 mo to Aug 2026
Capacity factor25%wind units, summer MW
Heat rate—thermal plants only
First online2016
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 104.5 | 22.9% | — |
| 2017 | 153.7 | 28.2% | — |
| 2018 | 155.3 | 28.5% | — |
| 2019 | 165.2 | 30.4% | — |
| 2020 | 163.1 | 29.9% | — |
| 2021 | 160.7 | 29.5% | — |
| 2022 | 156 | 28.7% | — |
| 2023 | 151.1 | 27.8% | — |
| 2024 | 152.2 | 27.9% | — |
| 2025 | 151.5 | 27.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| LTIGO | Onshore Wind Turbine | WT | 62.1 | 62.1 | Mar 2016 | Operating | — | ge 2.0-116 |
Owner / operator
Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| AES Distributed Energy | 100.0% | 62 MW |
Nearby plants
Within 80 km.
| Dolores Canyon Solar | 110 MW | 57.6 km |
| SMPA Solar 1 Community Solar | 1 MW | 66.7 km |
| Coyote Gulch Solar | — | 76.1 km |
| McPhee | 1 MW | 78 km |