← Back to map

SMPA Solar 1 Community Solar

Montrose County, Colorado · EIA plant ID 58547 · Operator: San Miguel Power Assn Inc
SolarSolar PhotovoltaicBA: PSCO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202618.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2013222.8%—
20141.718.9%—
20151.821.1%—
20161.921.2%—
2017222.3%—
2018222.3%—
20191.719.6%—
2020222.9%—
20211.416.2%—
2022222.5%—
20231.820.6%—
20241.719.7%—
20251.618.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV11Dec 2012Operating—coming soon

Owner / operator

Operator: San Miguel Power Assn Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
San Miguel Power Assn Inc100.0%1 MW

Nearby plants

Within 80 km.
Dolores Canyon Solar110 MW63.2 km
Latigo Wind Park62 MW66.7 km
Shavano Falls Hydro3 MW72.5 km
McPhee1 MW79.7 km