Granite Mountain Solar West, LLC

Iron County, Utah · EIA plant ID 59945 · Operator: clearway renewable operation & maintenance llc
SolarSolar PhotovoltaicBA: PACE
Nameplate50MWSummer 50 MW
Generators1in service
Net generation121GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202627.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201625.717.4%—
201712829.0%—
2018123.628.0%—
2019125.428.4%—
2020131.329.6%—
2021125.128.3%—
2022110.725.1%—
2023120.927.4%—
2024128.229.0%—
2025125.228.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GMSWSolar PhotovoltaicPV50.450.4Sep 2016Operating—coming soon

Owner / operator

Operator: clearway renewable operation & maintenance llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Clearway Energy, Inc100.0%50 MW

Nearby plants

Within 80 km.
Fiddler's Canyon #23 MW3.4 km
Granite Mountain BESS East80 MW7 km
Fiddler's Canyon #13 MW8.1 km
Granite Mountain Solar East, LLC80 MW8.8 km
Fiddler's Canyon 33 MW11.9 km
Three Peaks Power80 MW16.5 km