← Back to map

Maxim

Santa Clara County, California · EIA plant ID 59802 · Operator: Bloom Energy
Natural gasOther Natural GasCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor79%gas/coal/oil units, summer MW
Heat rate6,680Btu/kWhfossil units, electric fuel, HHV
First online2014Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%201420162018202020222024202679.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0007,0008,00020142016201820202022202420266,680 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20143.9105.0%6,712
20159.4106.9%7,046
20168.192.5%7,542
20177.990.7%—
20187.282.4%7,498
20197.281.9%8,583
20207.181.0%7,635
20217.383.7%7,522
20227.484.0%7,438
20236.674.9%—
2024667.8%8,061
20256.979.3%6,680

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MXM00Other Natural GasFC1.11Aug 2014Operating—coming soon

Owner / operator

Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Maxim100.0%1 MW

Nearby plants

Within 80 km.
AT&T Holger1 MW1.4 km
Gianera65 MW1.8 km
Agnews Power Plant32 MW2 km
Mission College Blvd. Fuel Cell5 MW2.4 km
Los Esteros Critical Energy Center306 MW2.6 km
Intel Santa Clara1 MW2.7 km