Los Esteros Critical Energy Center

Santa Clara County, California · EIA plant ID 55748 · Operator: Los Esteros Critical Energy Facility LLC
Natural gasNatural Gas Fired Combined CycleCAISOBA: CISO
Nameplate306MWSummer 300 MW
Generators5in service
Net generation161GWh12 mo to Aug 2026
Capacity factor6%gas/coal/oil units, summer MW
Heat rate8,875Btu/kWhfossil units, electric fuel, HHV
First online2003Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%200520102015202020256.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
7,0008,0009,00010,000200520102015202020258,875 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2003158.411.0%10,160
2004269.717.1%9,926
2005266.616.9%10,143
200678.25.0%9,911
200765.74.2%10,228
200875.44.8%10,563
200973.74.7%10,101
201039.52.5%10,596
201166.54.2%10,126
201200.0%—
2013297.514.6%8,358
2014254.49.5%8,025
2015351.613.1%8,356
2016153.95.7%8,688
2017225.58.4%8,510
2018356.413.3%8,435
2019215.68.0%8,463
2020273.210.2%8,738
2021303.111.3%8,457
2022180.16.7%8,960
2023179.56.8%9,064
2024233.38.8%8,978
2025156.56.0%8,846

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CAG5Natural Gas Fired Combined CycleCA126.1108Aug 2013Operating—coming soon
CTG1Natural Gas Fired Combined CycleCT4549Feb 2003Operating—coming soon
CTG2Natural Gas Fired Combined CycleCT4547Feb 2003Operating—coming soon
CTG3Natural Gas Fired Combined CycleCT4549Feb 2003Operating—coming soon
CTG4Natural Gas Fired Combined CycleCT4547Feb 2003Operating—coming soon

Owner / operator

Operator: Los Esteros Critical Energy Facility LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Los Esteros Critical Energy Facility LLC100.0%306 MW

Nearby plants

Within 80 km.
AmericoldCA - Plainville, CT2 MW0.8 km
BD Biosciences - Milpitas, CA1 MW0.8 km
AT&T Holger1 MW1.4 km
SJ/SC WPCP14 MW1.7 km
Zero Waste Energy Development Co LLC2 MW2 km
Agnews Power Plant32 MW2.2 km