← Back to map

Barre II Solar Project

Worcester County, Massachusetts · EIA plant ID 59766 · Operator: Kearsarge Solar LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202615.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20141.515.4%—
20152.518.7%—
20162.519.3%—
20172.317.5%—
20182.216.8%—
20192.317.8%—
20202.417.9%—
20212.216.7%—
20222.418.5%—
20232.216.4%—
20242.216.8%—
20252.115.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BIISolar PhotovoltaicPV1.51.5Apr 2014Operating—coming soon

Owner / operator

Operator: Kearsarge Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Kearsarge Solar LLC100.0%2 MW

Nearby plants

Within 80 km.
Stetson Road Solar - Barre I2 MW4.6 km
Barre Solar III LLC1 MW6.4 km
Spring Hill Road2 MW8.7 km
Hardwick-Athol & Eagle Hill3 MW8.9 km
Golden Hills Solar5 MW9.9 km
North Brookfield3 MW10.4 km